China Packaging Drinking Pure Water Bottling Filling Packing Bottling Plant

Product Details
Customization: Available
Condition: New
Customized: Customized
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Plant Area
>2000 square meters
Export Year
2012-08-01
Terms of Payment
LC, T/T, Western Union
  • China Packaging Drinking Pure Water Bottling Filling Packing Bottling Plant
  • China Packaging Drinking Pure Water Bottling Filling Packing Bottling Plant
  • China Packaging Drinking Pure Water Bottling Filling Packing Bottling Plant
  • China Packaging Drinking Pure Water Bottling Filling Packing Bottling Plant
  • China Packaging Drinking Pure Water Bottling Filling Packing Bottling Plant
  • China Packaging Drinking Pure Water Bottling Filling Packing Bottling Plant
Find Similar Products

Basic Info.

Model NO.
CGF
Voltage
380V
Composition
Filling Machine
Processing Material
Natural Ingredients
Process
Filling Package
Advantage 1
New Cap Elevator Avoid Cap Inverse
Advantage 2
New Filling Frame
Advantage 3
New Capping, Reflux Type
Advantage 4
New Fracture Filling Machine
Warranty
One Year
Delivery Time
30-40day
Transport Package
Wooden Case
Specification
8-8-3 16-12-6 24-24-8 32-32-10 40-40-12
Trademark
tango
Origin
Zhangjiagang
HS Code
8422301090
Production Capacity
20set Per Month

Product Description

Product description:

China Packaging drinking pure water bottling filling packing plant 


China Packaging Drinking Pure Water Bottling Filling Packing Bottling Plant

General description:

 
1) Compact conformation, good shape, cozy operation, excellent automaticity and poor labor intensity.
2) Only exchanging "star wheel", "feeding screw" and "arc guide plate" while  exchanging model of bottle to be need.
3) The all parts directly contacted with media are all adopted with food stage stainless steel without dead angle, so they can be cleaned easily.
4) Adopting advanced valve to control the inlet flow rate of liquids. It can keep the slight turbulence of liquids level in the solution barrel and ensure the accuracy in filling.
5) Closing feeding valve automatically while no bottle on machine avoiding the loss of aqueous feet. Filling automatically with a high speed and the control of liquids level is accurate.
6) High filling speed and mass flow rate, high precision of filling valve and control of liquids level is accurate and without loss.
7) The "capping head" is adopted magnetic-constant-torque device to ensure the high capping quality and without damages.
8) Adopting efficient cap settling system which carried perfect cap feeding and protection device.
9) It is adopted spiral descent fashion for the support plate for bottom of bottle at the outlet thumb wheel. And to adjust the input height is not necessary for exchanging model of bottle.
10) carried the perfect protection system to overload; it can be used to protect facilities and operators efficiently.


Filling machine inner fracture:

China Packaging Drinking Pure Water Bottling Filling Packing Bottling Plant


 Parameter:

 
Model
(CGFB)
16-12-6 18-18-6 24-24-8 32-32-10 40-40-12 50-50-15
  Washing head 16 18 24 32 40 50
Filling head 12 18 24 32 40 50
Capping head 6 6 8 10 12 15
Capacity(500ml) 4000BPH 6000BPH 1000BPH 1200BPH 16000BPH 24000BPH
Power 3.8kw 4.3kw 6.5kw 8.7kw 9.5kw 12kw
Overall size L*W*H 3050*2000*2400mm 3170*2070*2400mm 4070*2350*2400mm 5100*2600*2400mm 6250*3050*2400mm 7500*3900*2400mm

Auxiliary machines

China Packaging Drinking Pure Water Bottling Filling Packing Bottling Plant
China Packaging Drinking Pure Water Bottling Filling Packing Bottling Plant
Flow chart with client bottle photos:
 China Packaging Drinking Pure Water Bottling Filling Packing Bottling Plant

Factory photo:

China Packaging Drinking Pure Water Bottling Filling Packing Bottling Plant


Some key affair that client interest as follow:

 

Installation:

After equipment reached the workshop of customer, place the equipment according to plane layout we offered. We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line. The buyer need to supply the round tickets and accommodation of our engineer, and the salary.
We will send engineer, client pay ticket turn and back, and engineer each day usd50 cost.
 
How long time for installation?

 After machine arrive local, if client ready raw material, connect water pipeline and electricity, after prepared visa, we will send technician as client project situation to client factory, it will take about half month install, half month train custom engineer how to use and maintain machine.  

Training machine use and maintain

Our company offer technology training to customer. The content of training is structure and maintenance of equipment, control and operation of equipment. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures. 

Machine quality Guarantee

We promise that our goods are all new and not used. They're made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.

After sales

After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician. 

After sales

After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician. 

 

Can we see machines operation at our country ?

A1: We have installed many project at many countries. If u need see, we need talk customer that who bought from us, if they allow, then we will tell u contact info , u can visit them.

We advise client come visit our company, u can know our company and see our machines operation at workshop.

We will arrange car go pick up from nearby train station or airport.

 Welcome local joint us.
 

We will supply technology:

We will make solution as client bottle size, workshop space,budget...

We can help client design bottle and label. Make workshop layout as space size.

 

Spare parts:

will send one year spare parts with machines together.

 
Are u trading company or manufacturer ?

We are manufacturer, we have own export company.

 

Delivery time: 30-60day
 

What info need to supply before we make offer solution.
 
  1. Bottle type , bottle size, capacity requirement
  2. Source water quality report.
  3. Machine requirement: or u can tell us u need label bottle type,finally product photo, we will give advice from our experience.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier