Complete Automatic Glass Bottle Bottling Liquid Beverage Packaging Production Filling Line

Product Details
Customization: Available
Condition: New
Customized: Customized
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Plant Area
>2000 square meters
Export Year
2012-08-01
Terms of Payment
LC, T/T, Western Union
  • Complete Automatic Glass Bottle Bottling Liquid Beverage Packaging Production Filling Line
  • Complete Automatic Glass Bottle Bottling Liquid Beverage Packaging Production Filling Line
  • Complete Automatic Glass Bottle Bottling Liquid Beverage Packaging Production Filling Line
  • Complete Automatic Glass Bottle Bottling Liquid Beverage Packaging Production Filling Line
  • Complete Automatic Glass Bottle Bottling Liquid Beverage Packaging Production Filling Line
  • Complete Automatic Glass Bottle Bottling Liquid Beverage Packaging Production Filling Line
Find Similar Products

Basic Info.

Model NO.
CGF
Voltage
380V
Composition
Filling Machine
Processing Material
Water
Process
Mineral Water
Advantage 1
New Fracture Filling Machine
Cap Type
Crown Cap Al Cap Plastic Cap
Certificate
ISO SGS Ce
Guarantee
One Year
Suit Bottle Type
Glass Bottle From 200ml to 2000ml
Transport Package
Wooden Case
Trademark
tango
Origin
Zhangjiagang
HS Code
8422301090
Production Capacity
2000-20000bph

Product Description

 Product description:

Complete Automatic Glass Bottle Bottling Liquid Beverage Packaging Production Filling Line

General description/General description

For filling carbonated drink contains washing, filling and capping With complete automation, suitable for filling carbonated drink into polyester bottles And PET bottles. It can be used for all kinds of bottles. The bottleneck blocking makes The process of changing bottles easily by only adjusting the height of conveyor chain.
The filling process adopts the micro-pressure technology, Which makes filling process faster and more stable.

Inner fracture:-glass bottle

Complete Automatic Glass Bottle Bottling Liquid Beverage Packaging Production Filling Line
Main fracture:

 
Model (CGFB)  8-8-3 16-12-6 18-18-6 24-24-8 32-32-10 40-40-12 50-50-12 60-60-15
Washing head 8 12 18 24 32 40 50 60
Filling head 8 12 18 24 32 40 50 60
Capping head 3 6 86 8 10 12 12 15
Capacity (500ml) 2000bph 3000bph 6000bph 10000bph 13000bph 16000bph 20000bph 24000bph
Voltage  380V/50Hz ; 380V/60Hz, 380V/50Hz, 220V/60Hz
Overall size L*W*H 2000*1500*2200mm 2200*1600*2200mm 2500*1750*2200mm 2950*2150*2200mm 3720*2800*2200mm 4180*3200*2200mm 4720*3350*2750mm 6000*5450*2750mm

 
Technical parameter

1. Model of fan: DF-9;
2. Power fan: 2.2 KW/Unit; flowing capacity: 2800m3/h; full pressure: 1650MPa; rotation speed: 2840r/min; weight:38kg
4. Length of air conveyor: according to plant layout
      
Washing, filling, capping heads 14-12-4 18-18-6 24-24-8 32-32-8
Capacity based on 500ml 3000-4000 BPH 5000-7000 BPH 8000-12000 BPH 12000-15000 BPH
Applicable bottle H=170-320, Φ=50-100, (330∼2000ml)
Pressure  0.25-0.3 MPA
General power  1.5+0.37 KW 2.2+0.37 KW 3+0.45+0.25 KW 4+0.45+0.25 KW
Overall dimension 2300×1680×2650 2500×1760×2650 3100×2100×2650 3800×2800×2650
Weight 2600 KG 3500 KG 4800 KG 6500 KG  

Auxiliary machines
Complete Automatic Glass Bottle Bottling Liquid Beverage Packaging Production Filling Line

Contact info:

phone number:86-13739169728 

Auxiliary machines
Complete Automatic Glass Bottle Bottling Liquid Beverage Packaging Production Filling Line



Flow chart:

Complete Automatic Glass Bottle Bottling Liquid Beverage Packaging Production Filling Line


Some key affair that client interest as follow:

 

Installation:

After equipment reached the workshop of customer, place the equipment according to plane layout we offered. We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line. The buyer need to supply the round tickets and accommodation of our engineer, and the salary.
We will send engineer, client pay ticket turn and back, and engineer each day usd50 cost.
 
How long time for installation?

 After machine arrive local, if client ready raw material, connect water pipeline and electricity, after prepared visa, we will send technician as client project situation to client factory, it will take about half month install, half month train custom engineer how to use and maintain machine.  

Training machine use and maintain

Our company offer technology training to customer. The content of training is structure and maintenance of equipment, control and operation of equipment. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures. 

Machine quality Guarantee

We promise that our goods are all new and not used. They're made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.

After sales

After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician. 

After sales

After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician. 

 

Can we see machines operation at our country ? 

A1: We have installed many project at many countries. If u need see, we need talk customer that who bought from us, if they allow, then we will tell u contact info , u can visit them.

We advise client come visit our company, u can know our company and see our machines operation at workshop.

We will arrange car go pick up from nearby train station or airport.

 Welcome local joint us.
 

We will supply technology:

We will make solution as client bottle size, workshop space,budget...

We can help client design bottle and label. Make workshop layout as space size.

 

Spare parts: 

will send one year spare parts with machines together.

 
Are u trading company or manufacturer ?

We are manufacturer, we have own export company.

 

Delivery time: 30-60day
 

What info need to supply before we make offer solution.
 
  1. Bottle type , bottle size, capacity requirement
  2. Source water quality report.
  3. Machine requirement: or u can tell us u need label bottle type,finally product photo, we will give advice from our experience.
Contact info:

phone no:86-13739169728

Facebook:tangomachine

 

 


Workshop photo:

Complete Automatic Glass Bottle Bottling Liquid Beverage Packaging Production Filling Line



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier