Complete Glass Bottle Soda Water Beverage Liquid Filling Bottling Plant

Product Details
Customization: Available
Condition: New
Customized: Customized
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Plant Area
>2000 square meters
Export Year
2012-08-01
Terms of Payment
LC, T/T, Western Union
  • Complete Glass Bottle Soda Water Beverage Liquid Filling Bottling Plant
  • Complete Glass Bottle Soda Water Beverage Liquid Filling Bottling Plant
  • Complete Glass Bottle Soda Water Beverage Liquid Filling Bottling Plant
  • Complete Glass Bottle Soda Water Beverage Liquid Filling Bottling Plant
  • Complete Glass Bottle Soda Water Beverage Liquid Filling Bottling Plant
  • Complete Glass Bottle Soda Water Beverage Liquid Filling Bottling Plant
Find Similar Products

Basic Info.

Model NO.
DCGF24-24-8
Composition
Filling Machine
Processing Material
Carbonated Beverage
Process
Prepare Filling Labeling
Certificate
ISO SGS Ce
Warranty
One Year
Application
Glas Bottle Soda with Gas Without Gas
Suit Cap Type
Plastic Cap Crown Cap Wide Lap
Bottle Type
Glass Bottle with Metal Cap, Plastic Bottle
Bottle Volume
250ml,330ml,500ml,750ml,1000ml,1500ml,
Contain Machine
Water Treatment, Gas Beverage Mixer, Filling,Label
Capacity
2000bph,5000bph,8000bph,11000bph
Delivery Time
40-50day
After Sale Service
Engineer Go Local Install, Train Buyer Use
Transport Package
Wooden Case
Specification
8-8-3 16-12-6 24-24-8 32-32-10 40-40-12
Trademark
TANGO
Origin
Zhangjiagang
HS Code
8422301090
Production Capacity
200set/Year

Product Description

CProduct description:


Complete Glass Bottle Soda Water Beverage Liquid Filling Bottling Plant
Complete Bottled Carbonated Sparkling Water Bottling Production filling packing Plant

General description/General description

3-in-1 filling machine, combined with rinsing, filling and capping. It is innovated and designed in the requirement of still pure water and mineral water, on the bases of introducing, digesting and absorbing advanced technology from Germany and Italy.

Al capping machine
Complete Glass Bottle Soda Water Beverage Liquid Filling Bottling Plant

Complete Glass Bottle Soda Water Beverage Liquid Filling Bottling Plant


Inner fracture:

Complete Glass Bottle Soda Water Beverage Liquid Filling Bottling Plant


Main features

 

Model (CGFB)  8-8-3 16-12-6 18-18-6 24-24-8 32-32-10 40-40-12 50-50-12 60-60-15
Washing head 8 12 18 24 32 40 50 60
Filling head 8 12 18 24 32 40 50 60
Capping head 3 6 86 8 10 12 12 15
Capacity (500ml) 2000bph 3000bph 6000bph 10000bph 13000bph 16000bph 20000bph 24000bph
Voltage  380V/50Hz ; 380V/60Hz, 380V/50Hz, 220V/60Hz
Overall size L*W*H 2000*1500*2200mm 2200*1600*2200mm 2500*1750*2200mm 2950*2150*2200mm 3720*2800*2200mm 4180*3200*2200mm 4720*3350*2750mm 6000*5450*2750mm

 
Technical parameter

1. Model of fan: DF-9;
2. Power fan: 2.2 KW/Unit; flowing capacity: 2800m3/h; full pressure: 1650MPa; rotation speed: 2840r/min; weight:38kg
4. Length of air conveyor: according to plant layout
      
Washing, filling, capping heads 14-12-4 18-18-6 24-24-8 32-32-8
Capacity based on 500ml 3000-4000 BPH 5000-7000 BPH 8000-12000 BPH 12000-15000 BPH
Applicable bottle H=170-320, Φ=50-100, (330∼2000ml)
Pressure  0.25-0.3 MPA
General power  1.5+0.37 KW 2.2+0.37 KW 3+0.45+0.25 KW 4+0.45+0.25 KW
Overall dimension 2300×1680×2650 2500×1760×2650 3100×2100×2650 3800×2800×2650
Weight 2600 KG 3500 KG 4800 KG 6500 KG  


Auxiliary machines

Complete Glass Bottle Soda Water Beverage Liquid Filling Bottling Plant


Contact info:

 
Facebook:tangomachine

 
 

Flow chart:
Complete Glass Bottle Soda Water Beverage Liquid Filling Bottling Plant

Term and condition:

1. Payment
30% deposit against the contract by T/T should be paid before the order;
70% balance should be paid off by T/T after inspection before delivery;

2. Delivery time 
60 days after received the down payment;

3. Training
Against the requests of the Buyer, the Seller's technician could train the Buyer's operators in the Buyer's factory in the periods of installing & adjusting; 

4. Installation and adjustment 
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should pay for the engineer's visa application cost, round air tickets, food & board before his departure; And pay USD 80/day to engineer.

5. Guarantee
one year

Competitive Advantages
Well and High Quality Control , 
Prompt Delivery ,long term testing before delivery
improve new technology all time
Customer's Design and Logo are Welcome , 
Competitive Prices , 
Earth-friendly Products , 
In a Variety of Design , 
Small Order Acceptable , 
ODM Accepted , 
OEM Accepted .

High quality: international brand electricity and good material

Our machines are using world famous brand component.
MITSUBISH PLC variable-frequency governor and OMRON optical switch form Japan.
SCHNEIDER electrical appliance components from France and Germany.
LG air switch,contactor and circuit breaker from South Korea.
SEMIKRON control thyristors from Germany.
BOURNS potentiometer from America.

Professional After Sale Service
Our engineer will be on site to guide installation and debugging , we also provide free staff training. Further more,Our After Sale service department offering 24 hours 7days service ,we will quickly respond you once you have any question when using our machines.

Long history of the Company
Our company is famous for its finest quality and enjoys a long-standing reputation at home and abroad. Having a long history of more than two decades,great experience accumulated in such a long time making us on the top list of Chinese company.


For more:
 
Facebook:tangomachine

phone:+8613739169728Complete Glass Bottle Soda Water Beverage Liquid Filling Bottling Plant

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier