Complete Glass Bottle Carbonated Beverage Production Line for Coca Pepsi

Product Details
Customization: Available
After-sales Service: for Year Service
Warranty: One Year
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Plant Area
>2000 square meters
Export Year
2012-08-01
Terms of Payment
LC, T/T, Western Union
  • Complete Glass Bottle Carbonated Beverage Production Line for Coca Pepsi
  • Complete Glass Bottle Carbonated Beverage Production Line for Coca Pepsi
  • Complete Glass Bottle Carbonated Beverage Production Line for Coca Pepsi
  • Complete Glass Bottle Carbonated Beverage Production Line for Coca Pepsi
  • Complete Glass Bottle Carbonated Beverage Production Line for Coca Pepsi
  • Complete Glass Bottle Carbonated Beverage Production Line for Coca Pepsi
Find Similar Products

Basic Info.

Model NO.
CGFB32-32-10
Customized
Customized
Voltage
380V
Composition
Filling Machine
Processing Material
Carbonated Beverage
Process
Prepare Filling Labeling
Certificate
ISO SGS CE
Inspection
Support Client Local Test Machine Quality &Factory
Application
Soda Pepsi Fanta with Gas
Bottle Volume
250ml, 300ml, 500ml, 750ml, 1000ml, 1500ml, 2000ml
Bottle Type
Glass Bottle with Metal Cap, Crown Cap, Pet Bottle
Delivery Time
40-60day
Contain Machine
Water Treatment System, Prepare System, CO2 Mixer
Contain Machine 2
Filling, Labeling, Wrapping Machine.Warm Tunnel
After Sale Service
Engineer Go Local Install, Train Buyer Use Maintai
Transport Package
Wooden Case
Specification
8-8-3 16-12-6 24-24-8 32-32-10 40-40-12
Trademark
TANGO
Origin
Zhangjiagang
HS Code
8422301090
Production Capacity
200set/Year

Product Description

  Product description:


Complete Glass Bottle Carbonated Beverage Production Line for Coca Pepsi

Automatic glass bottle carbonated beverage beer wine liquid packing filler

General description/General description

3-in-1 filling machine, combined with rinsing, filling and capping. It is innovated and designed in the requirement of still pure water and mineral water, on the bases of introducing, digesting and absorbing advanced technology from Germany and Italy.

Al capping machine
Complete Glass Bottle Carbonated Beverage Production Line for Coca Pepsi

Complete Glass Bottle Carbonated Beverage Production Line for Coca Pepsi


Inner fracture:

Complete Glass Bottle Carbonated Beverage Production Line for Coca Pepsi


Main features

 

Model (CGFB)  8-8-3 16-12-6 18-18-6 24-24-8 32-32-10 40-40-12 50-50-12 60-60-15
Washing head 8 12 18 24 32 40 50 60
Filling head 8 12 18 24 32 40 50 60
Capping head 3 6 86 8 10 12 12 15
Capacity (500ml) 2000bph 3000bph 6000bph 10000bph 13000bph 16000bph 20000bph 24000bph
Voltage  380V/50Hz ; 380V/60Hz, 380V/50Hz, 220V/60Hz
Overall size L*W*H 2000*1500*2200mm 2200*1600*2200mm 2500*1750*2200mm 2950*2150*2200mm 3720*2800*2200mm 4180*3200*2200mm 4720*3350*2750mm 6000*5450*2750mm

 
Technical parameter

1. Model of fan: DF-9;
2. Power fan: 2.2 KW/Unit; flowing capacity: 2800m3/h; full pressure: 1650MPa; rotation speed: 2840r/min; weight:38kg
4. Length of air conveyor: according to plant layout
      
Washing, filling, capping heads 14-12-4 18-18-6 24-24-8 32-32-8
Capacity based on 500ml 3000-4000 BPH 5000-7000 BPH 8000-12000 BPH 12000-15000 BPH
Applicable bottle H=170-320, Φ=50-100, (330∼2000ml)
Pressure  0.25-0.3 MPA
General power  1.5+0.37 KW 2.2+0.37 KW 3+0.45+0.25 KW 4+0.45+0.25 KW
Overall dimension 2300×1680×2650 2500×1760×2650 3100×2100×2650 3800×2800×2650
Weight 2600 KG 3500 KG 4800 KG 6500 KG  


Auxiliary machines

Complete Glass Bottle Carbonated Beverage Production Line for Coca Pepsi


Contact info:

 
Facebook:tangomachine

 
 

Flow chart:
Complete Glass Bottle Carbonated Beverage Production Line for Coca Pepsi

Term and condition:

1. Payment
30% deposit against the contract by T/T should be paid before the order;
70% balance should be paid off by T/T after inspection before delivery;

2. Delivery time 
60 days after received the down payment;

3. Training
Against the requests of the Buyer, the Seller's technician could train the Buyer's operators in the Buyer's factory in the periods of installing & adjusting; 

4. Installation and adjustment 
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should pay for the engineer's visa application cost, round air tickets, food & board before his departure; And pay USD 80/day to engineer.

5. Guarantee
one year

Competitive Advantages
Well and High Quality Control , 
Prompt Delivery ,long term testing before delivery
improve new technology all time
Customer's Design and Logo are Welcome , 
Competitive Prices , 
Earth-friendly Products , 
In a Variety of Design , 
Small Order Acceptable , 
ODM Accepted , 
OEM Accepted .

High quality: international brand electricity and good material

Our machines are using world famous brand component.
MITSUBISH PLC variable-frequency governor and OMRON optical switch form Japan.
SCHNEI-DER electrical appliance components from France and Germany.
LG air switch,contactor and circuit breaker from South Korea.
SEMI-KRON control thyristors from Germany.
BOURNS potentiometer from America.

Professional After Sale Service
Our engineer will be on site to guide installation and debugging , we also provide free staff training. Further more,Our After Sale service department offering 24 hours 7days service ,we will quickly respond you once you have any question when using our machines.

Long history of the Company
Our company is famous for its finest quality and enjoys a long-standing reputation at home and abroad. Having a long history of more than two decades,great experience accumulated in such a long time making us on the top list of Chinese company.


For more:
 
Facebook:tangomachine

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier